k12 education

Image courtesy of Culpepper Construction.
Marianna k8 Elementary School
Marianna, FL
WEI designed HVAC, Plumbing, and Fire Sprinkler systems for the new school. HVAC Design included 4-pipe, water cooled, central plant with high efficiency chillers and condensing boilers, variable volume air handling units, and digital controls. The design incorporated air cleaning methods to reduce outside air and operating costs. Plumbing Design included low consumption fixtures, full kitchen, and lab gas system. Fire Sprinkler design included wet pipe systems.

Image courtesy of Childer’s Construction Co.
Dune Lakes Elementary School
Santa Rosa beach, FL
WEI designed HVAC, Plumbing, and Fire Sprinkler systems for the new 145,000 SF school. HVAC Design included a 4-pipe, water cooled central plant with high efficiency chillers and condensing boilers, variable volume air handling units with reheat terminal units, and digital controls. Plumbing design included low consumption fixtures, full kitchen, gas and heat pump water heating systems. Fire sprinkler design included wet-pipe systems serving the majority of the school, with dry-pipe systems serving the outdoor covered dining area.

Image courtesy of ReliantSouth Construction Group.
A. Gary Walsingham Academy
Panama City Beach, FL
Design included a four-pipe water, cooled central plant with high efficiency chillers and condensing boilers, variable volume air handling units with reheat terminal units, and digital controls. Plumbing design included low consumption fixtures, full kitchen, gas, and electric water heating systems. Fire sprinkler design included wet-pipe systems serving the majority of the school, with dry-pipe systems serving the outdoor covered dining area.

Rocky Bayou Christian Academy
Crestview, FL
WEI provided full Mechanical, Electrical, Plumbing, and Fire Protection Design Services for this new, ~22,000SF classroom addition. The 2 story building consists of an entry lobby with an open stair to second floor, several classrooms, as well as lab spaces. Chemistry/Science labs required a laboratory fume exhaust fan using dedicated outside air units in conjunction with split system dx equipment to serve the space.
Electrical Design included new 208/120V electrical service for new classroom building. Generated lighting and receptacle layouts for classroom spaces; including laboratory classrooms. By Coordinating between the architect and designer, we provided specialized lighting for architectural design elements, performed lighting calculations, electrical connections for HVAC systems, and design for new building’s fire alarm system.
Plumbing Design included Gas brought in for use in the lab spaces and an emergency shut off at the entrance, as well as master control valves. Plumbing fixtures were coordinated with the architect to meet aesthetic requirements. An Acid neutralization tank was used to treat waste from the lab spaces prior to connection to site sanitary system.
Fire Protection Design fully sprinkled the building.

Jinks Middle School
Panama City, FL
WEI provided project included a full size basketball court with bleachers, concessions area, lobby, locker rooms, weight room, and gang toilets. Mechanical systems included an air cooled chiller with a condensing natural gas boiler serving variable volume air handling units and digital controls. Plumbing systems included natural gas, domestic water, sanitary waste and vent. Fire sprinkler systems are wet pipe.

Image courtesy of Allstate Construction Group.