Government
Washington County Courthouse
Chipley, FL
WEI provided Mechanical, Plumbing, and Fire Sprinkler Design services for the new 40,000 SF facility.
HVAC Design included an air-cooled chiller plant with gas fired boiler. Air distribution throughout the building utilized variable volume air handling units with single duct terminal units with reheat. Noise calculations were completed for all areas and appropriate noise control measures were incorporated into the design. Digital controls were utilized for the HVAC systems with a web-based interface. Holding cells and similar areas included secure air devices and bars inside ductwork. The parking garage and sally port included ventilation and CO alarm systems.
Plumbing Design included low water consumption commercial grade fixtures, domestic water distribution, sanitary waste and vent, and natural gas. Penal fixtures were used in holding cells and similar areas.
Fire Protection Design included wet pipe for the main building, dry pipe for the parking garage, and standpipes for each stairwell. Holding cells and similar areas included vandal resistant sprinkler heads.
Panama City Beach Police Department
Panama City Beach, FL
WEI provided Mechanical, Plumbing, and Fire Protectoin design services for the new 20,000 SF facility.
HVAC Design included an air-cooled chiller plant with gas fired boiler. Air distribution throughout the building utilized variable volume air handling units with single duct terminal units with reheat. Digital controls were utilized for the HVAC systems with a web-based interface. Holding cells, evidence storage, and similar areas included secure air devices and security bars inside ductwork.
Plumbing Design included low water consumption commercial grade fixtures, domestic water distribution, sanitary waste / vent, and natural gas. Penal fixtures were used in holding cells and similar areas.
Fire Protection Design included wet pipe for the main building, while holding cells and similar areas included vandal resistant sprinkler heads.
Panama City City Hall
Panama City, FL
WEI provided Mechanical, Plumbing, and Fire Protection Designs for the renovated 58,000 SF building.
HVAC Systems reused several existing air handling units, the boiler, chiller, cooling tower, and pumps. The existing mechanical systems were adapted from their original design to the new layout with new ductwork, air handling units, and variable volume terminal units. The existing digital control system was utilized with a new web based front end.
Plumbing Design accounted for restroom renovations and reconfigured for new commercial low water consumption fixtures.
Fire Protection Design included wet-pipeSprinkler System.
South Walton Fire District Fleet Maintenance
Santa Rosa Beach, FL
WEI produced Mechanical, Plumbing, and Fire Protection designs for a 22,000 SF maintenance and logistics building.
Mechanical systems designed included DX HVAC, vehicle exhaust, radiant heating, laundry, and compressed air.
Plumbing Design included domestic water, natural gas, sanitary waste / vent, and vehicle wash systems.
Fire Protection Design included a wet-pipe sprinkler system.
PCB MOSQUITO CONTROL District
Panama City Beach, FL
WEI provided Mechanical, Plumbing, and Fire Protection design for the new District Headquarters Facility that included:
- 7,500 SF Administration Building with a lab, insectory, and administration spaces
- 16100 SF Shop and Hangar Building
- 2400 SF Chemical Shed, Wash Bay, and Fish Tank
- 375 SF Chicken Coop