{"id":7227,"date":"2026-02-10T20:55:18","date_gmt":"2026-02-10T20:55:18","guid":{"rendered":"https:\/\/watford-engineering.com\/home\/local-government-graceville-fire-department-copy\/"},"modified":"2026-02-10T21:01:33","modified_gmt":"2026-02-10T21:01:33","slug":"reference-project-local-government-panama-city-beach-fire-station-30","status":"publish","type":"post","link":"https:\/\/watford-engineering.com\/home\/reference-project-local-government-panama-city-beach-fire-station-30\/","title":{"rendered":"Local Government: Panama City Beach Fire Station #30"},"content":{"rendered":"<!--themify_builder_content-->\n<div id=\"themify_builder_content-7227\" data-postid=\"7227\" class=\"themify_builder_content themify_builder_content-7227 themify_builder tf_clear\">\n    \t\t\t\t<div  data-parallax-bg=\"desktop\" data-css_id=\"mflk330\" data-lazy=\"1\" class=\"module_row themify_builder_row fullwidth_row_container tb_mflk330 tb_first tf_w\">\n\t\t\t\t\t\t<div class=\"row_inner col_align_top tb_col_count_3 tf_box tf_rel\">\n\t\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_cmg8064 first\">\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_5q18550\">\n\t\t\t\t\t<!-- module image -->\n<div  class=\"module module-image tb_st9c620 image-top   tf_mw\" data-lazy=\"1\">\n        <div class=\"image-wrap tf_rel tf_mw\">\n\t\t    <img loading=\"lazy\" decoding=\"async\" width=\"704\" height=\"397\" src=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1.jpg\" class=\"wp-post-image wp-image-7236\" title=\"panama city beach fire station #30\" alt=\"panama city beach fire station #30\" srcset=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1.jpg 704w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1-300x169.jpg 300w\" sizes=\"auto, (max-width: 704px) 100vw, 704px\" \/>\t\n\t\t<\/div>\n\t<!-- \/image-wrap -->\n    \n    \t<\/div>\n<!-- \/module image --><!-- module text -->\n<div  class=\"module module-text tb_8n81026   \" data-lazy=\"1\">\n\t    <div  class=\"tb_text_wrap\">\n\t\t<h3 data-start=\"723\" data-end=\"767\">Panama City Beach #30<\/h3>\n<p data-start=\"235\" data-end=\"540\">WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as well as drain trough for an extractor. Gas was routed to water heaters as well as heaters in the apparatus bay. Fire protection design included a wet-pipe sprinkler system.<\/p>\n<p data-start=\"736\" data-end=\"783\"><strong data-start=\"736\" data-end=\"783\"><span style=\"color: #f50808;\">12,454<\/span> SF | $<span style=\"color: #f21818;\">6.6<\/span>M <\/strong><strong data-start=\"736\" data-end=\"783\">Construction Value<\/strong><\/p>    <\/div>\n<\/div>\n<!-- \/module text -->\t\t<\/div>\n\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_6okw301 last\">\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t<\/div>\n<!--\/themify_builder_content-->","protected":false},"excerpt":{"rendered":"<p>Panama City Beach #30 WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as well as [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[29],"tags":[48,21,55,49,43,58,52,36,50,51,56,57,20,54,53,42,44,47,46,35,37],"class_list":["post-7227","post","type-post","status-publish","format-standard","hentry","category-reference-project","tag-design-engineering","tag-electrical-engineering","tag-elementary-school-design","tag-facility-design-services","tag-fire-protection-engineering","tag-florida","tag-grand-ridge-florida","tag-inc","tag-jackson-county-school-board","tag-jackson-county-school-system","tag-marianna","tag-marianna-florida","tag-mechanical-engineering","tag-north-west-florida","tag-panhandle-florida","tag-plumbing-engineering","tag-professional-consulting","tag-professional-design-services","tag-professional-engineering","tag-watford-engineering","tag-wei","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"builder_content":"<img src=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1.jpg\" title=\"panama city beach fire station #30\" alt=\"panama city beach fire station #30\" srcset=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1.jpg 704w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/panama-city-beach-fire-station-30-1-300x169.jpg 300w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/>\n<h3 data-start=\"723\" data-end=\"767\">Panama City Beach #30<\/h3> <p data-start=\"235\" data-end=\"540\">WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as well as drain trough for an extractor. Gas was routed to water heaters as well as heaters in the apparatus bay. Fire protection design included a wet-pipe sprinkler system.<\/p> <p data-start=\"736\" data-end=\"783\"><strong data-start=\"736\" data-end=\"783\">12,454 SF | $6.6M <\/strong><strong data-start=\"736\" data-end=\"783\">Construction Value<\/strong><\/p>","_links":{"self":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/comments?post=7227"}],"version-history":[{"count":7,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7227\/revisions"}],"predecessor-version":[{"id":7239,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7227\/revisions\/7239"}],"wp:attachment":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/media?parent=7227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/categories?post=7227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/tags?post=7227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}