{"id":7186,"date":"2026-02-10T16:22:18","date_gmt":"2026-02-10T16:22:18","guid":{"rendered":"https:\/\/watford-engineering.com\/home\/local-government-miramar-fire-station-copy\/"},"modified":"2026-02-10T20:37:06","modified_gmt":"2026-02-10T20:37:06","slug":"reference-project-local-government-panama-city-beach-fire-station-31","status":"publish","type":"post","link":"https:\/\/watford-engineering.com\/home\/reference-project-local-government-panama-city-beach-fire-station-31\/","title":{"rendered":"Local Government: Panama City Beach Fire Station #31"},"content":{"rendered":"<!--themify_builder_content-->\n<div id=\"themify_builder_content-7186\" data-postid=\"7186\" class=\"themify_builder_content themify_builder_content-7186 themify_builder tf_clear\">\n    \t\t\t\t<div  data-parallax-bg=\"desktop\" data-css_id=\"6yss080\" data-lazy=\"1\" class=\"module_row themify_builder_row fullwidth_row_container tb_6yss080 tb_first tf_w\">\n\t\t\t\t\t\t<div class=\"row_inner col_align_top tb_col_count_3 tf_box tf_rel\">\n\t\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_fzpv998 first\">\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_wmdl889\">\n\t\t\t\t\t<!-- module image -->\n<div  class=\"module module-image tb_sj1t942 image-top   tf_mw\" data-lazy=\"1\">\n        <div class=\"image-wrap tf_rel tf_mw\">\n\t\t    <img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1227\" src=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000.jpg\" class=\"wp-post-image wp-image-7192\" title=\"639004317818670000\" alt=\"639004317818670000\" srcset=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000.jpg 1920w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-300x192.jpg 300w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-1024x654.jpg 1024w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-768x491.jpg 768w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-1536x982.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\t\n\t\t<\/div>\n\t<!-- \/image-wrap -->\n    \n    \t<\/div>\n<!-- \/module image --><!-- module text -->\n<div  class=\"module module-text tb_p7g3900   \" data-lazy=\"1\">\n\t    <div  class=\"tb_text_wrap\">\n\t\t<h3 data-start=\"723\" data-end=\"767\">Panama City&nbsp; Beach Fire Station #31<\/h3>\n<p data-start=\"235\" data-end=\"540\">WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as well as drain trough for an extractor. Gas was routed to water heaters as well as heaters in the apparatus bay. Fire protection design included a wet-pipe sprinkler system.<\/p>\n<p data-start=\"736\" data-end=\"783\"><strong data-start=\"736\" data-end=\"783\"><span style=\"color: rgb(247, 10, 10);\">14,908<\/span> SF | $<span style=\"color: #f21818;\">6.6<\/span>M <\/strong><strong data-start=\"736\" data-end=\"783\">Construction Value<\/strong><\/p>    <\/div>\n<\/div>\n<!-- \/module text -->\t\t<\/div>\n\t\t\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col3-1 tb_f0us900 last\">\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t<\/div>\n<!--\/themify_builder_content-->","protected":false},"excerpt":{"rendered":"<p>Panama City&nbsp; Beach Fire Station #31 WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[29],"tags":[48,21,55,49,43,58,52,36,50,51,56,57,20,54,53,42,44,47,46,35,37],"class_list":["post-7186","post","type-post","status-publish","format-standard","hentry","category-reference-project","tag-design-engineering","tag-electrical-engineering","tag-elementary-school-design","tag-facility-design-services","tag-fire-protection-engineering","tag-florida","tag-grand-ridge-florida","tag-inc","tag-jackson-county-school-board","tag-jackson-county-school-system","tag-marianna","tag-marianna-florida","tag-mechanical-engineering","tag-north-west-florida","tag-panhandle-florida","tag-plumbing-engineering","tag-professional-consulting","tag-professional-design-services","tag-professional-engineering","tag-watford-engineering","tag-wei","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"builder_content":"<img src=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000.jpg\" title=\"639004317818670000\" alt=\"639004317818670000\" srcset=\"https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000.jpg 1920w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-300x192.jpg 300w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-1024x654.jpg 1024w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-768x491.jpg 768w, https:\/\/watford-engineering.com\/wp-content\/uploads\/2026\/02\/639004317818670000-1536x982.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>\n<h3 data-start=\"723\" data-end=\"767\">Panama City&nbsp; Beach Fire Station #31<\/h3> <p data-start=\"235\" data-end=\"540\">WEI provided mechanical, plumbing, and fire protection design. Mechanical design included split dx units with 100% OAU for humidity control, added a hood and related fans for a kitchen, and utilized heaters along with high volume low speed fans in the apparatus bays. Plumbing included gas water heaters, as well as drain trough for an extractor. Gas was routed to water heaters as well as heaters in the apparatus bay. Fire protection design included a wet-pipe sprinkler system.<\/p> <p data-start=\"736\" data-end=\"783\"><strong data-start=\"736\" data-end=\"783\">14,908 SF | $6.6M <\/strong><strong data-start=\"736\" data-end=\"783\">Construction Value<\/strong><\/p>","_links":{"self":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/comments?post=7186"}],"version-history":[{"count":8,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7186\/revisions"}],"predecessor-version":[{"id":7197,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/posts\/7186\/revisions\/7197"}],"wp:attachment":[{"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/media?parent=7186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/categories?post=7186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/watford-engineering.com\/home\/wp-json\/wp\/v2\/tags?post=7186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}