Dune Lakes Elementary School
WEI designed HVAC, Plumbing, and Fire Sprinkler systems for the new 145,000 SF school. HVAC Design included a 4-pipe, water cooled central plant with high efficiency chillers and condensing boilers, variable volume air handling units with reheat terminal units, and digital controls. Plumbing design included low consumption fixtures, full kitchen, gas and heat pump water heating systems. Fire sprinkler design included wet-pipe systems serving the majority of the school, with dry-pipe systems serving the outdoor covered dining area.